Southwest Connecticut Reliability Project: Phase 1
Correspondence related to The Connecticut Light & Power Company's cost application for the 345-kW Bethel-Norwalk Project in Southwest Connecticut.
| Date |
Document Title |
Document Type |
| Sep 14, 2006 |
Revised Cost Breakdown |
 |
PDF (15.1k) |
| Jul 14, 2006 |
Connecticut Attorney General Richard Blumenthal's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. |
 |
PDF (101k) |
| Jul 14, 2006 |
Maine Public Utilities Commission comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. (ME PUC references RI PUC, NH PUC, VT PSB and VT DPS agreement with its comments.) |
 |
PDF (36.6k) |
| Jul 14, 2006 |
Connecticut Department of Public Utility Control and Office of Consumer Counsel joint comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. |
 |
PDF (78.6k) |
| Jul 14, 2006 |
Comments of the Massachusetts Dept. of Telecommunications and Energy on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. |
 |
PDF (99.6k) |
| Jul 14, 2006 |
Connecticut Light & Power Company's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. |
 |
PDF (2.7Mb) |
| Jul 14, 2006 |
United Illuminating comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation. |
 |
PDF (179k) |
| Jun 15, 2006 |
Connecticut Governor Rell's comments on ISO-NE's June 15, 2006 draft determination letter for Bethel-Norwalk Project cost allocation |
 |
PDF (83.7k) |
| Dec 28, 2005 |
CL&P's complete set of response to ISO's September 13, 2005 questions regarding the transmission cost allocation application for the Bethel-Norwalk Project in Southwest Connecticut |
 |
PDF (2.3Mb) |