"C","Morning Report" "C","Report for 2/5/2012" "C","Report Generated 02/05/2012 13:17:35 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Sunday, Feb 5 2012","08:17:35 EST" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Saturday, Feb 4 2012 hour ending 19",16492 "G","3. Operable Capacity Analysis" "D","A. Capacity Supply Obligation (CSO)",30978 "D","B. Capacity Additions EcoMax Bid > CSO",2674 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",1575 "D","E. Uncommitted Available Generation (non fast start)",12922 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",-690 "D","NYISO NNC",112 "D","NYISO CSC",330 "D","NB",448 "D","Phase 2",-1373 "D","Highgate",-218 "D","Net Deliveries",-1391 "D","G. Total Available Capacity (A+B+C-D-E-F)",20546 "D","H. Peak Load Forecast For Hour 19",16810 "D","I. Total Operating Reserve Requirement",2361 "D","J. Capacity Required",19171 "D","K. Surplus = (+) Deficiency = (-) (G - J)",1375 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",1375 "G","4. Largest First Contingency" "D","____",1674 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",21005 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1674 "D","Ten Minute Reserve Estimate:",1674 "D","Thirty Minute Reserve Requirement:",686 "D","Thirty Minute Reserve Estimate:",2061 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT IN","TRANSFER LIMIT OUT","SCHEDULED CONTRACT" "H","(MW)","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",-1400,1200,-690 "D","NYISO NNC",-200,200,112 "D","NYISO CSC",-346,330,330 "D","NB",-850,550,448 "D","Phase 2",-2000,1200,-1373 "D","Highgate",-218,0,-218 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","PARTLY CLOUDY","W-7",33 "D","Hartford","PARTLY CLOUDY","W-4",33 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","0 Units",0 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","N/A" "D","Alert:","N/A" "D","Intensity:","N/A" "D","Observed Activity:","N/A" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"