Current Status |
|||||
Report Name |
Change Summary |
Effective Date |
Description |
Template |
Sample |
sd_fcmdardncba |
Modified. In section "Asset Hourly" columns "Nominated Consumption Limit MW", "Day-Ahead Bid Min Consumption Limit MW", "Performance Min Consumption Limit MW", and "Non-Conforming Min Consumption Limit MW" have been removed. This report will be issued only if there is a Dispatch ARD registered into the system. |
06.01.2011 |
XLTX | CSV | |
View Archived Status at the foot of this page |
|||||
SD_FCMDARDNCBA – Forward Capacity Market Capacity DARD Non-Conforming Bid Adjustment Report – Rev 0SD_FCMDARDNCBA _<market service>_<customerid>_<settlement date>_<version>.CSV Availability: A preliminary report will be available annually in the month of May which will include preliminary values for the upcoming commitment period, based on the first 11 months (June through April) of the previous commitment period. A report based on all 12 months of the previous commitment period will be issued during the month of June. |
|
REPORT COLUMN |
DESCRIPTION |
Asset |
|
Commitment Period Begin Date |
Start date of the Capacity Commitment Period. |
Asset ID |
Numerical identifier for the Dispatchable Asset Related Demand. |
Asset Name |
Name of the Dispatchable Asset Related Demand. |
Non-Conforming Bid Adjustment MW |
Sum of the Violation MW for the Dispatchable Asset Related Demand applicable to the Capacity Commitment Period. |
Asset Hourly |
|
Shortage Event Trading Date |
Calendar date on which the Shortage Event occurred. |
Shortage Event Trading Interval |
Hour during which the Shortage Event occurred. |
Asset ID |
Numerical identifier for the Dispatchable Asset Related Demand. |
Asset Name |
Name of the Dispatchable Asset Related Demand. |
Nominated Consumption Limit MW |
The registered value of the Nominated Consumption Limit for the Dispatchable Asset Related Demand. |
Day-Ahead Bid Min Consumption Limit MW |
The minimum amount, in MW, available from a Dispatchable Asset Related Demand that is not available for economic dispatch and is based on the physical characteristics as submitted as part of a Resource’s Offer Data. |
Performance Min Consumption Limit MW |
The minimum amount, in MW, available from a Dispatchable Asset Related Demand that is not available for economic dispatch as adjusted in Real-Time for a performance-related reason. |
Non-Conforming Min Consumption Limit MW |
Either the Day-Ahead Bid Min Consumption Limit MW or the Performance Min Consumption Limit MW. |
Violation MW |
The hourly MW value that violates the relationship between the registered Nominated Consumption Limit and the Non-Conforming Min Consumption Limit MW. |
Archived Status |
||
Report Name |
Change Summary |
Effective Date |
| sd_fcmdardncba | New. This new report takes effect with commitment period June 2011 but report will be posted before commitment period starts. The first version of this report will be posted early 2011 as long as there is a Dispatch ARD registered into the system. |
06.01.2011 |