Forward Capacity Market Working Group Materials
Oct 29-30, 2009
The FCM Working Group (FCMWG) is a collaborative effort by NECPUC, NEPOOL and ISO-NE, to discuss proposed changes to the Forward Capacity Market. The FCMWG is non-voting and membership is open to all interested stakeholders in New England.

Date Document Title Document Type
Nov 02, 2009
Generator's redline version of Talking Points of Select Load Interests
PDF (58.1k)
Nov 02, 2009
Talking Points from Select Generator Parties, as presented and discussed by Carrie Allen and others to the October 30 FCMWG
DOC (35k)
Nov 01, 2009
Participant List FCMWG Meeting #11, October 26, 2009
PDF (82.9k)
Oct 30, 2009
Talking Points from Select Load Parties, as presented and discussed by Tim Brennan to the October 30 FCMWG
PDF (18.0k)
Oct 29, 2009
Design Basis Document Draft, October 29 version for discussion on October 30
DOC (153k)
Oct 28, 2009
ISO APR Presentation for October 29-30 FCMWG Meetings
PDF (401k)
Oct 28, 2009
For discussion and review at the October 29-30 FCMWG Meetings, a revised DRAFT Design Basis Document (October 28 Version)
DOC (138k)
Oct 28, 2009
Draft Alternative Price Rule Design Basis Document for discussion during the October 29-30 FCMWG Meetings
DOC (38k)
Oct 27, 2009
Meeting Notes from the October 26 FCMWG Meeting
PDF (19.4k)
Oct 27, 2009
For discussion purposes -- DISCUSSION DRAFT evaluation of the cost of investing in new pure capacity under a volatile revenue environment and in a stable revenue environment (Note: subject to enhancements and refinements)
PDF (69.5k)
Oct 26, 2009
Discussion Draft: Enhancements to the Forward Capacity Market
PDF (101k)
  Copyright ©2012 ISO New England Inc.